sched/fair: Defer calling scaling functions
Do not call the scaling functions in case time goes backwards or the last update of the sched_avg structure has happened less than 1024ns ago. Signed-off-by: Dietmar Eggemann <dietmar.eggemann@arm.com> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Cc: Juri Lelli <Juri.Lelli@arm.com> Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Mike Galbraith <efault@gmx.de> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Thomas Gleixner <tglx@linutronix.de> Cc: daniel.lezcano@linaro.org <daniel.lezcano@linaro.org> Cc: mturquette@baylibre.com <mturquette@baylibre.com> Cc: pang.xunlei@zte.com.cn <pang.xunlei@zte.com.cn> Cc: rjw@rjwysocki.net <rjw@rjwysocki.net> Cc: sgurrappadi@nvidia.com <sgurrappadi@nvidia.com> Cc: vincent.guittot@linaro.org <vincent.guittot@linaro.org> Cc: yuyang.du@intel.com <yuyang.du@intel.com> Link: http://lkml.kernel.org/r/55EDA2E9.8040900@arm.com Signed-off-by: Ingo Molnar <mingo@kernel.org>
This commit is contained in:
committed by
Ingo Molnar
parent
6115c793ca
commit
6f2b04524f
@ -2552,8 +2552,7 @@ __update_load_avg(u64 now, int cpu, struct sched_avg *sa,
|
|||||||
u64 delta, scaled_delta, periods;
|
u64 delta, scaled_delta, periods;
|
||||||
u32 contrib;
|
u32 contrib;
|
||||||
unsigned int delta_w, scaled_delta_w, decayed = 0;
|
unsigned int delta_w, scaled_delta_w, decayed = 0;
|
||||||
unsigned long scale_freq = arch_scale_freq_capacity(NULL, cpu);
|
unsigned long scale_freq, scale_cpu;
|
||||||
unsigned long scale_cpu = arch_scale_cpu_capacity(NULL, cpu);
|
|
||||||
|
|
||||||
delta = now - sa->last_update_time;
|
delta = now - sa->last_update_time;
|
||||||
/*
|
/*
|
||||||
@ -2574,6 +2573,9 @@ __update_load_avg(u64 now, int cpu, struct sched_avg *sa,
|
|||||||
return 0;
|
return 0;
|
||||||
sa->last_update_time = now;
|
sa->last_update_time = now;
|
||||||
|
|
||||||
|
scale_freq = arch_scale_freq_capacity(NULL, cpu);
|
||||||
|
scale_cpu = arch_scale_cpu_capacity(NULL, cpu);
|
||||||
|
|
||||||
/* delta_w is the amount already accumulated against our next period */
|
/* delta_w is the amount already accumulated against our next period */
|
||||||
delta_w = sa->period_contrib;
|
delta_w = sa->period_contrib;
|
||||||
if (delta + delta_w >= 1024) {
|
if (delta + delta_w >= 1024) {
|
||||||
|
Reference in New Issue
Block a user